Shield Construction with
Ground Freezing Work at Kouno Neyagawa
District with Osaka-kita Joint Groove

Shield Construction with Ground Freezing Work
at Kouno Neyagawa District with Osaka-kita Joint Groove

大阪北共同溝交野寝屋川地区工事
Objective Infrastructure Improvement
Techniques Ground Freezing
Period 09/2012~03/2014
Comment

The ICELOCK method was employed as a temporary protection work for connecting the shield tunnel and the adjacent shaft at a depth of 25 m. Since construction could not be carried out from the ground surface, the ability to conduct construction from underground and the high reliability of the ICELOCK were the reasons for its adoption. The construction period is for constructing four locations.

(Location: Osaka)