Disaster Prevention Project in Sumida River

Disaster Prevention Project in Sumida River

隅田川(新大橋上流)左岸防潮堤耐震補強工事
Objective

Disaster Prevention

Aseismic Reinforcement and Liquefaction Mitigation

Infrastructure Improvement

Techniques Jet Grouting
Period

07/2014~02/2015

Comment

The low-lying eastern area of Tokyo is highly vulnerable to storm surges and flooding. As part of levee improvement efforts and seismic reinforcement measures following recent major earthquakes, a seismic retrofit project was carried out on the Sumida River tidal barrier.

Due to the narrow construction site located near residential buildings, equipment was transported and construction was carried out using barges.