
| Objective | Disaster Prevention Environmental Conservation Infrastructure Improvement |
|---|---|
| Techniques | Chemical Grouting |
| Period | 04/2014~02/2018 |
| Comment | The Oita River Dam is a 91m height rockfill dam, and it is a multipurpose dam which aimed to control water flow for the flood and supply daily water. We have performed slope protection work in the project. |