Seismic Reinforcement Work at a Pump Station

Seismic Reinforcement Work at a Pump Station

某ポンプ場耐震補強工事
Objective Aseismic Reinforcement and Liquefaction Mitigation
Techniques Jet Grouting
Period 01/2018~02/2018
Comment

Our jet grouting method, JETCRETE, was adopted for seismic reinforcement of an existing rainwater pump station. We jet grouted after installing our small jet grouting machine at the warehouse and discharge tank, by aligning the construction with the dry season. Because the construction took place indoor, it was unable to install a sludge pit inside, so we used our "closed system" for collecting spoil and prevent spoil from scattering around the area.

(Location: Aichi)