Seismic Reinforcement for
Existing Embankment at Edo River in Tokyo

Seismic Reinforcement for Existing Embankment
at Edo River in Tokyo

旧江戸川防潮堤耐震補強工事
Objective Aseismic Reinforcement and Liquefaction Mitigation
Techniques Jet Grouting
Period 03/2014~01/2015
Comment

Jet Grouting was used to reinforce the foundation structures of the embankment as a precaution against the huge earthquake. The equipment, cement slurry, and the spoil were transported using a boat for construction.